• EN
  • Search & Find

    308 results:
    201. Climate-friendly heating for the Saar region  
    STEAG and the Entsorgungsverband Saar municipal waste disposal association are tapping the potential of the AVA Velsen waste-to-energy plant for regional district heating supply Saarbrücken. Saarbrücken-based STEAG New Energies GmbH and Fernwärme Verbund Saar GmbH (FVS), together with  
    202. 2.14 Swivel jet nozzle DW-V2 147  
    2.14 Swivel jet nozzle DW-V2 147 Data Volume flow rate range 11 – 589 l/s [40 – 2 120 m³/h] Nominal sizes DN 60 – DN 250 Throw 3 - 50 m Discharge height 2.5 – 10 m Features Circular free jet Discharge direction adjustable through ± 30°  
    203. District heating expansion successful  
    STEAG Fernwärme Essen celebrates completion of the eastern line project Essen. STEAG Fernwärme Essen GmbH & Co. KG, a joint venture of STEAG Fernwärme and Stadtwerke Essen AG, is celebrating the successful completion of its eastern line project in Essen: “After 1,180 days of construction work,  
    204. 1.17 Adjustable radial outlet with core tube RA-V2 134  
    1.17 Adjustable radial outlet with core tube RA-V2 134 Data Volume flow rate range 111 – 4 444 l/s [400 – 16 000 m³/h] Nominal sizes DN 250 – DN 900 Discharge height 2.8 – 15 m Features Discharge direction adjustable from horizontal to vertical  
    205. New branding for STEAG  
    Transformation of the long-established company now expressed in new Corporate Design Essen. The Essen-based energy company has revamped its brand identity. In doing so, STEAG is visibly expressing the company’s ever more rapid transformation. The long-established energy company has already been  
    206. 5.2 Ventilation unit (recirculated air) for mixing ventilation LG-UM-M-LB, for horizontal floor mounting 201  
    5.2 Ventilation unit (recirculated air) for mixing ventilation LG-UM-M-LB, for horizontal floor mounting 201 To ventilate office and administrative buildings that have façades with floo-to-ceiling glazing, Krantz supplies a ventilation unit work- ing with recirculated air and designed for raised  
    207. STEAG scores with CHP bids  
    In the current tender for CHP capacity, the energy company is awarded funding for four projects in Saarland and Thuringia. Essen/Saarbrücken. In the current tendering process instituted by the German Federal Network Agency for project funding in the field of combined heat and power generation  
    208. 5.22 Laminar outlet VA-L 200  
    5.22 Laminar outlet VA-L 200 Data Volume flow rate range depends on size 80 -800 l/s [300 - 3 000 m3/h] Velocity u, related to L x W 0.15 – 0.4 m/s Size adaptable to workplace Coverage zone zone directly below air outlet Features  
    209. Herne’s new power plant takes delivery of its heart  
    600-tonne crane inserts gas turbine in STEAG’s new-build plant Herne/Essen. After an eleven-day waterway journey from Berlin to Herne, the gas turbine for STEAG’s new power plant arrived on Monday and was placed in the boiler house by a crane. The 457-tonne heart of the environmentally friendly  
    210. STEAG registers Lünen power plant for final closure  
    STEAG no longer sees any economic prospects for the hard coal-fired generating units 6 and 7 in Lünen. One power plant unit in Völklingen, Saarland, is to be taken off the grid temporarily for seasonal reasons. Essen. Energy company STEAG today filed a legally binding notice with the German  
    211. SENS implementing PV project in the UK  
    STEAG subsidiary building 50-megawatt solar farm in Norfolk King’s Lynn/Essen/Würzburg. STEAG Solar Energy Solutions GmbH (SENS), a subsidiary of Essen-based energy company STEAG and a specialist for PV projects, will be building a solar farm with output of 50 megawatts (MWp) in the eastern English  
    212. 1.21 Variable twist outlet with jet straightener DD-VG 139  
    1.21 Variable twist outlet with jet straightener DD-VG 139 Data Volume flow rate range 170 – 3 055 l/s [600 – 11 000 m³/h] Nominal sizes DN 315, DN 400, DN 500, DN 630 and DN 710 Discharge height 3 – 28 m Features Adjustable discharge  
    213. Cable laying at the new power station in Herne  
    Crossing of Hertener Straße causes step-by-step two-way lane closures Herne. The construction of the new and highly efficient gas and steam turbine power plant in Herne is progressing rapidly. Now three 400 kilovolt (kV) underground cables are to be laid. This will involve crossing under Hertener  
    214. Top-scoring trainees  
    Six apprentices in Saarland pass their examinations ahead of schedule with good to excellent grades Völklingen. STEAG’s industrial and technical training in Saarland is concentrated at the Völklingen-Luisenthal site. There, STEAG’s technicians of tomorrow have been successfully trained for several  
    215. Recuperative Thermal Oxidiser 253  
    Recuperative Thermal Oxidiser 253 Classical technique to clean exhaust air from a production process with a high heat requirement. Features Thermal oxidisers with recuperative exhaust air pre-heating for the cleaning of industrial exhaust air with high concentrations of organic pollutants. The  
    216. 5.1 Ventilation units for mixing ventilation LG-Z-M-LB and LG-ZUM-M-LB, for horizontal floor mounting 205  
    5.1 Ventilation units for mixing ventilation LG-Z-M-LB and LG-ZUM-M-LB, for horizontal floor mounting 205 Decentralized air conditioning via the building facade. To air condition office and administrative buildings having facades with floor-to-ceiling glazing, Krantz supplies ventilation units for  
    217. STEAG returns 2.5 gigawatts additional power plant capacity to the market  
    Power plants Bexbach and Weiher return from grid reserve, power plants Bergkamen and Völklingen-Fenne, who were designated for permanent shutdown, continue operations Essen. STEAG is returning both its hard coal fired power plants Bexbach and Weiher in Saarland from the grid reserve to the market.  
    218. Valuable contribution to the heating transition  
    The pipeline and civil engineering work on Essen’s eastern line district heating expansion project has been completed. Essen. STEAG Fernwärme Essen GmbH & Co. KG, a joint venture of Stadtwerke Essen AG and STEAG Fernwärme GmbH, has successfully completed work on Essen’s eastern line district  
    219. STEAG to discuss energy of tomorrow  
    “Digital Energy Week” to give insights into current industry trends and projects Essen. The Essen-based energy company STEAG will be hosting a “Digital Energy Week” from November 8 to 11, where national and international speakers from within the company will be joined by STEAG customers in  
    220. 1.2. HEPA Filter System GS-Box 186  
    1.2. HEPA Filter System GS-Box 186 The HEPA filter system, type GS is used to take in HEPA filter elements. It is a less expensive alternative to the famous and reliable Krantz safe change filter housings type SCF classic and SCF hightec. It is used where the requirements concerning the concerning  
    Search results 201 until 220 of 308