• EN
  • Search & Find

    278 results:
    41. Office building Rahmann, Eschborn 385  
    Office building Rahmann, Eschborn 385  
    42. Restaurant Eskimo, Gent 343  
    Restaurant Eskimo, Gent 343  
    43. Solar energy for Essen’s drinking water supplies  
    STEAG subsidiary SENS constructs a photovoltaic system for Essen’s waterworks Essen/Würzburg. For Wassergewinnung Essen GmbH, a subsidiary of the Stadtwerke Essen AG and Gelsenwasser AG municipal companies, sustainability and the conservation of resources are central cornerstones of its activities.  
    44. Surface seal for the old section of Troisdorf Landfill  
    Earthworks in the first construction section to commence as soon as the weather permits Troisdorf/Gladbeck. At the Troisdorf landfill site, work to seal the surface in the old landfill area is due to start in the near future. All the necessary preparations have been carried out, and construction  
    45. Axel Springer Verlag, Essen-Kettwig 231  
    Axel Springer Verlag, Essen-Kettwig 231  
    46. Eurogress Aachen 267  
    Eurogress Aachen 267 Special featureCombination of retangular displacement outlet QR and linear step displacement outlet Q-SL with built-in honeycombs for guiding the air flow  
    47. STEAG reorganizes its management team  
    Supervisory Board appoints three new directors for the Essen-based energy company Essen. The Supervisory Board of STEAG GmbH has appointed new members to three positions in the company’s Board of Management for the coming years. In addition to Dr. Wolfgang Cieslik and Alfred Geißler, the previous  
    48. 4.2 Chilled beam DK-LIG/E, with ventilation function, one-sided discharge 230  
    4.2 Chilled beam DK-LIG/E, with ventilation function, one-sided discharge 230 For room cooling and heating in the commercial sector, trade and industry, for high cooling capacities and simultaneous fresh air supply to improve indoor air quality and humidity control. The secondary air is removed  
    49. Eurohaus, Frankfurt 268  
    Eurohaus, Frankfurt 268  
    50. Daikin Airconditioning Central Europe, Brunn 251  
    Daikin Airconditioning Central Europe, Brunn 251  
    51. John Deere European Parts Distribution Center, Bruchsal 294  
    John Deere European Parts Distribution Center, Bruchsal 294  
    52. Eurostation, Anderlecht 269  
    Eurostation, Anderlecht 269  
    53. STEAG Fernwärme is a partner to the InnovationCity roll out in Gelsenkirchen  
    STEAG is the heating supplier to three InnovationCity projects // Climate protection report confirms: district heating has the best ratio of ecology to economy Essen/Gelsenkirchen. What was successfully implemented in the InnovationCity Ruhr | Model city of Bottrop is now to be launched in  
    54. 4.1 Chilled beam DK-LIG/Z, with ventilation function, two-sided discharge 229  
    4.1 Chilled beam DK-LIG/Z, with ventilation function, two-sided discharge 229 For room cooling and heating in commercial and industrial buildings. High cooling capacities; with fresh air supply to enhance the indoor air quality. The secondary air is taken directly from the occupied zone. The supply  
    55. Savings bank "Kreissparkasse", Euskirchen 406  
    Savings bank "Kreissparkasse", Euskirchen 406  
    56. Service and Maintenance  
    Service and Maintenance Customized, specification-oriented services for nuclear and conventional areas. Features Maintenance, inspection, sanitation, repair, periodic inspection (WKP), measurements, evaluation, and consultation. Qualification for special loads, renovation and modernisation,  
    57. End comes after 47 years: Voerde power plant taken out of service  
    One of Germany's largest hard coal fired power plants is taken off the grid // Employee program 'Out of work, into work' successful // Dismantling will take several years Voerde. After 47 years, last Friday one of the largest hard-coal-fired power plant sites in Germany was officially taken out  
    58. Service and Maintenance 125  
    Service and Maintenance 125 Customized, specification-oriented services for nuclear and conventional areas. Features Maintenance, inspection, sanitation, repair, periodic inspection (WKP), measurements, evaluation, and consultation. Qualification for special loads, renovation and  
    59. STEAG’s strategy pays  
    Earnings from normal operations exceed forecast Group result in the black 45 million euro profit transfer Profitable overseas activities support transformation Essen. For the shareholders, their investment in the STEAG Group has once again paid off. The Essen-based energy company is  
    60. The Sun rises in the East  
    STEAG SENS and LSG Group establish joint venture Würzburg/Vienna/Essen. With immediate effect STEAG Solar Energy Solutions, a subsidiary of the Essen-based STEAG GmbH energy group, is cooperating in a new joint venture with the LSG Group from Vienna. The long-standing partners and PV experts will  
    Search results 41 until 60 of 278