Durch die Schnellauswahl lassen sich Komponenten passend für Ihren Einsatzfall auswählen. In der Version 4.1.29 wurde ein Druckdialog zugefügt, durch den sich die Ergebnisse der Schnellauswahl zur Dokumentation ausdrucken lassen.
Kompaus 4 and CadCreator
'Kompaus' is an interactive electronic
4.13 Ceiling displacement outlet Q-DN and Q-DV 185
Data
Type Q-DN, non-adjustable Volume flow rate range 47 - 140 l/s [170 - 500 m³/h] Discharge velocity 0.15 – 0.45 m/s Sizes 625 mm x 625 mm (square) 625 mm x 1 250 mm (rectangular)
2.15 Twist nozzle DW-V2-DR 154
Data
Volume flow rate range up to 395 l/s [1 420 m³/h] Nominal sizes DN 80 - DN 250 Throw 1 – 17 m Discharge height 2.8 - 10 m
Features
Twist nozzle with small jet penetration depth for air distribution into
Conical displacement outlet VA-K
Low-turbulence displacement flow for halls where supply air must be discharged from a great height.
Displacement ventilation for indoor firing ranges VA-RSA
The system is designed to ensure an extensive supply air distribution into indoor firing
2.17 Air Transfer Element OG-S, OG-T and OG-U 167
Data
Type OG-S and OG-T OG-U Volume flow rate range S-shape: approx. 53 l/(s•m) [190 m³/(h•m)] T-shape: approx. 47 l/(s•m) [170 m³/(h•m)] at a pressure drop of 15 Pa 25 l/s [90 m3/h] at a
2.20 Combined multiplex outlet FA-VT-K 145
Data
Volume flow rate range ≤ 40 l/(s•m) [145 m³/(h•m)] for supply air and return air respectively Nominal lengths 600, 800 and 1 000 Height of air outlet 260 mm Discharge height 2.5 – 4 m
Features
STEAG welcomes National Hydrogen Strategy and hopes for rapid implementation
Essen. In mid-June, the German Government presented the National Hydrogen Strategy after a long period of preparation. STEAG welcomes the blueprint for a successful market ramp-up of a hydrogen sector in Germany which is
Essen. With the phase-out of nuclear power production in 2022 and the planned end of coal-fired power generation in 2038, one thing is certain: Wind and solar energy will be the main pillars of electricity supply in Germany in the future. However, both renewable energy sources are subject to
600-tonne crane inserts gas turbine in STEAG’s new-build plant
Herne/Essen. After an eleven-day waterway journey from Berlin to Herne, the gas turbine for STEAG’s new power plant arrived on Monday and was placed in the boiler house by a crane. The 457-tonne heart of the environmentally friendly
Message of hope and inspiration projected onto the stack of STEAG’s power plant in Herne
Herne. There’s no missing it if you’re driving along the A 42 or A 43 freeway past STEAG’s Herne power plant: a laser projection emblazoning the some 300-meter-high stack with a message of hope and inspiration
STEAG reaches important milestones in the first construction section
Essen. The first construction section in the expansion of the district heating network in Essen, operated by STEAG, is totally on schedule. With the successful crossing below Schützenbahn street, an important step towards
Contracts signed for the second part of the energy system at the refinery in Gelsenkirchen-Scholven
Gelsenkirchen/Essen. The Essen-based energy company STEAG GmbH has been appointed by the bp subsidiary Ruhr Oel GmbH – BP Gelsenkirchen to take on the design and construction of a water treatment
State of the art flue gas cleaning
Essen. The lignite-fired power plant Pljevlja, located some five kilometers to the southwest of the town of the same name near the Serbian border, is to be extensively modernized. The major refit will contribute significantly to improving air quality in
STEAG Energy Services, the services subsidiary of STEAG, and Kraftanlagen Heidelberg will be working together to dismantle the core internals of the reactor pressure vessel at the Mühleberg nuclear power plant.
Essen. In cooperation with Kraftanlagen Heidelberg, STEAG Energy Services GmbH (SES)
STEAG applies for final decommissioning of Herne 4 hard coal fired power plant
Herne/Essen. At STEAG’s long-established power plant site in Herne, construction is currently in progress on a state-of-the-art combined cycle gas turbine (CCGT) power plant, which is to replace the hard coal fired unit
Led by High Performance Battery Technology and STEAG, eight partners are taking part in the ideas competition staged by the German Federal Ministry of Economic Affairs (BMWi)
Essen. In the context of the energy transition, the German government has set itself the aim of rapidly expanding generation
STEAG publishes Global Compact report
Essen. The Essen-based energy company has published its yearly Global Compact report. STEAG has been a member of the German UN Global Compact network since 2011. The ten Global Compact principles constitute a voluntary commitment by companies to adopt