    1.2 Multifunction ceiling AVACS circulating air 224 The Multifunction exposed ceiling AVACS recirculated air is a variation on our AVACS supply air system. Our proven cooling ceiling technology is combined with an AVACS recirculated air fan, invisible to the user. The result is a visually-appealing  
    102. STEAG registers two power plants in the Saarland for final closure  
    Decision made after thorough reassessment of economic viability Essen/Quierschied/Bexbach. Essen-based energy company STEAG today notified the Federal Network Agency of its plan to permanently shut down its two power plant units Weiher 3 and Bexbach in the Saarland. The statutory publication on the  
    103. STEAG harnessing waste heat from mine water for district heating supply  
    Innovative energy solution for Saarland municipalities Camphausen and Sulzbach Camphausen/Sulzbach/Saarbrücken. STEAG New Energies GmbH, a Saarbrücken-based subsidiary of the Essen energy company STEAG GmbH, is planning an innovative CHP facility at the site of the former Camphausen underground  
    104. 3.2 Contact cooling ceiling system KKS-4/GK, for gypsum plasterboard 220  
    3.2 Contact cooling ceiling system KKS-4/GK, for gypsum plasterboard 220 Data Nominal length 500 mm to 2 500 mm Nominal width unperforated: 420 mm perforated: 250 mm Overall system height ≥ 80 mm Connection type press fitting  
    105. STEAG scores with CHP bids  
    In the current tender for CHP capacity, the energy company is awarded funding for four projects in Saarland and Thuringia. Essen/Saarbrücken. In the current tendering process instituted by the German Federal Network Agency for project funding in the field of combined heat and power generation  
    106. 5.6 Ventilation unit (supply/return air) for mixing ventilation LG-ZA-M-SB, for vertical parapet mounting 217  
    5.6 Ventilation unit (supply/return air) for mixing ventilation LG-ZA-M-SB, for vertical parapet mounting 217 Data Supply/Return air volume flow rate max. 33 l/s [120 m³/h] respectively Amount of heat recovered approx. 50% Total cooling output 500 W  
    107. Congratulations, STEAG Fernwärme!  
    On October 20, the district heating supplier from Essen is 60 years young Essen/Bottrop/Gelsenkirchen. STEAG Fernwärme GmbH looks back on the beginnings of its entrepreneurial activity: What started with the commissioning of the heating plant at Schederhofstrasse in Essen on October 20, 1960, has  
    108. Mobile STEAG technology helping to supply district heating in Neu-Ulm  
    During the one-year period of construction work on the Stadtwerke Ulm district heating network, three particularly quiet, mobile energy units are being deployed Ulm/Saarbrücken/Essen. SWU Energie GmbH, Ulm’s municipal utility company, is renewing the generation facilities in its district heating  
    109. 2.3 Static cooling ceiling system SKS-5/3, for visible installation 216  
    2.3 Static cooling ceiling system SKS-5/3, for visible installation 216 High-capacity elements for installation as exposed ceiling elements with elegant panelling design. They can be used to make free-hanging chilled sails or chilled islands to be integrated into any type of suspended ceiling. This  
    110. EPH subsidiary has bought STEAG Power Minerals  
    EPPE strengthens its position in the sustainable business and invests in STEAG Power Minerals Prague/Essen. EP Power Europe, a.s. (EPPE), a subsidiary of Energetický a průmyslový holding, a.s. (EPH), signed an agreement with STEAG GmbH for the purchase of the shares in STEAG Power Minerals GmbH  
    111. 2.2 Static cooling ceiling system SKS-4/3-duo, for concealed installation 215  
    2.2 Static cooling ceiling system SKS-4/3-duo, for concealed installation 215 Data Nominal length 1 000 mm - 4 000 mm Nominal width 400 mm - 1 200 mm Nominal height 120 mm Pipe spacing 100 mm Connection type push-in fitting or  
    112. Herne’s energy future takes shape  
    STEAG applies for final decommissioning of Herne 4 hard coal fired power plant Herne/Essen. At STEAG’s long-established power plant site in Herne, construction is currently in progress on a state-of-the-art combined cycle gas turbine (CCGT) power plant, which is to replace the hard coal fired unit  
    113. STEAG registers Völklingen Model Power Plant for provisional closure  
    No effect on supplies from the site to the Saar district heating network Völklingen/Essen. The Essen-based energy company STEAG today notified the Federal Network Agency of the provisional closure of the Völklingen Model Power Plant (MKV) unit in the Saarland. This announcement on the transparency  
    114. EPH subsidiary completes acquisition of STEAG Power Minerals  
    EP Power Europe, a.s. (EPPE), a subsidiary of Energetický a průmyslový holding, a.s. (EPH), and STEAG today announced successful closing of the acquisition of STEAG Power Minerals GmbH (SPM) and its facilities by EPPE. Prague/Essen. The acquisition agreement had been announced on March 12 this  
    115. STEAG secures Allianz Global Investors as partner for wind farms in France  
    Retaining a 51 percent stake, STEAG remains majority shareholder and continues to be in charge of commercial and technical management of the wind farms Essen. Essen As part of its active portfolio management, the Essen-based energy company STEAG is selling a 49 percent stake in its wind farm  
    116. District heating supplier FVS reduces its carbon footprint  
    Phase-out of coal improves emissions balance and requires adjustment of the tariff system Saarbrücken. STEAG and Fernwärme-Verbund Saar (FVS) are making further progress with the energy transition. As the district heating supply in the Saar region is to do without energy from hard coal in future,  
    117. STEAG subsidiary Mingas-Power moves forward with mining heap wind power project  
    Project partners inaugurate 12 MW Kohlenhuck Wind Farm high above Moers // Investment volume 20 million euros // Third wind farm on RAG mining heap Essen/Moers. Boulders and craters as far as the eye can see – on a plateau at the Kohlenhuck mining heap in the north of Moers, the project partners  
    118. STEAG power plant project reaches next milestone  
    Start of natural gas supply through the Thyssengas pipeline Herne/Dortmund/Essen. Construction of STEAG’s new combined cycle power plant in Herne is making good progress. Following connection of the plant to the Thyssengas natural gas network almost a year ago, representatives of Thyssengas, STEAG  
    119. Energy transition through fuel switch  
    STEAG converts two district heating boilers from coal and oil to natural gas // In addition, state-of-the-art technical upgrades for plant operation Essen/Duisburg. Mitsubishi Power Europe received an order from STEAG Fernwärme GmbH, the largest district heating company in North Rhine-Westphalia,  
    120. STEAG takes over second waste to energy facility from Vattenfall  
    Contractual closing for IKW Rüdersdorf completed // Employees will be taken over Essen. With the contractual closing in Berlin today, STEAG has taken over all the shares in Industriekraftwerk Rüdersdorf (IKW Rüdersdorf), located to the south-east of Berlin, from power supplier Vattenfall with  