• EN
  • Search & Find

    308 results:
    161. Gerhard Jochum elected Chairman of STEAG Supervisory Board  
    “He is excellently suited for this role” // Guntram Pehlke resigns after nine years in office Essen. Following the signing of the trust agreement between the municipal utilities participating in STEAG GmbH through Kommunale Beteiligungsgesellschaft GmbH (KSBG) and the restructuring expert Dr. Jan  
    162. 2.2.2. Pressure Relief Dampers for high opening pressures, with switching function KL-EM 236  
    2.2.2. Pressure Relief Dampers for high opening pressures, with switching function KL-EM 236 In a great variety of different applications within HVAC systems pressure relief dampers manufactured by Krantz are used to limit the pressure and control it, respectively. Typical applications include the  
    163. Living Labs for the Energy Transition: Partner network tests new battery technology  
    Led by High Performance Battery Technology and STEAG, eight partners are taking part in the ideas competition staged by the German Federal Ministry of Economic Affairs (BMWi) Essen. In the context of the energy transition, the German government has set itself the aim of rapidly expanding generation  
    164. Change of management at STEAG New Energies  
    Anke Langner newly appointed to the management board // Thomas Billotet to retire // Dr. Markus Laukamp to take up new role outside the STEAG Group Saarbrücken/Essen. Several changes are afoot in the management of Saarbrücken’s STEAG New Energies GmbH, a subsidiary of Essen-based energy company  
    165. On-site testing  
    Our R&D at your facility No matter how careful the planning and implementation of a facility might be, in practice something unpredictable can happen at any time. In such cases, our R&D experts also come directly to you with their know-how. measurement of comfort parameters: indoor air  
    166. STEAG harnessing waste heat from mine water for district heating supply  
    Innovative energy solution for Saarland municipalities Camphausen and Sulzbach Camphausen/Sulzbach/Saarbrücken. STEAG New Energies GmbH, a Saarbrücken-based subsidiary of the Essen energy company STEAG GmbH, is planning an innovative CHP facility at the site of the former Camphausen underground  
    167. STEAG takes over second waste to energy facility from Vattenfall  
    Contractual closing for IKW Rüdersdorf completed // Employees will be taken over Essen. With the contractual closing in Berlin today, STEAG has taken over all the shares in Industriekraftwerk Rüdersdorf (IKW Rüdersdorf), located to the south-east of Berlin, from power supplier Vattenfall with  
    168. Herne’s energy future takes shape  
    STEAG applies for final decommissioning of Herne 4 hard coal fired power plant Herne/Essen. At STEAG’s long-established power plant site in Herne, construction is currently in progress on a state-of-the-art combined cycle gas turbine (CCGT) power plant, which is to replace the hard coal fired unit  
    169. STEAG applies for further power plant unit closures  
    Völklingen-Fenne CHP plant and Bergkamen power plant to go off line Essen/Völklingen/Bergkamen. The management of Essen-based energy company STEAG resolved today to register further power plant units for provisional closure. A similar application had already been made in early April for the Model  
    170. Energy transition through fuel switch  
    STEAG converts two district heating boilers from coal and oil to natural gas // In addition, state-of-the-art technical upgrades for plant operation Essen/Duisburg. Mitsubishi Power Europe received an order from STEAG Fernwärme GmbH, the largest district heating company in North Rhine-Westphalia,  
    171. 2.1.3. Rectangular Damper S 234  
    2.1.3. Rectangular Damper S 234 Data Admissible operation pressure for housing ± 10 000 Pa Admissible differential pressure for damper blade in both directions ± 10 000 Pa Admissible design temperature for damper -20°C up to +120°C Adm. leakage rate  
    172. STEAG to supply hydrogen  
    Agreements with public transport company Saarbahn in place Saarbrücken/Völklingen. When the “HydroHub Fenne”, the hydrogen project of energy company STEAG in Völklingen-Fenne, produces green, climate-neutral hydrogen from 2026 onwards, a regional customer, the public transport company Saarbahn,  
    173. 2.1.2. Gastight Rectangular Damper GD-R 165  
    2.1.2. Gastight Rectangular Damper GD-R 165 Data Dimensions - Rectangular design - Square design   max. 1 800 mm x 1 200 mm from 400 mm x 400 mm up to 1 200 mm x 1 200 mm Actuator electrical, pneumatic, manual, or electrical actuator also  
    174. STEAG opens training workshop in Herne  
    New facility with an area of 900 square meters provides optimum learning conditions for trainees in commercial and technical professions Herne. Herne’s Mayor Dr. Frank Dudda and Dr. Andreas Reichel, Human Resources Director and member of the Board of Management of STEAG GmbH, have together  
    175. 3.3. Leak Test Device LTD 148  
    3.3. Leak Test Device LTD 148 Features The leakage air flow is determined following the constant pressure method, which means the housing or the test groove of the seal resp. is filled with air until the predetermined test pressure is reached. The feed in air flow which is necessary to keep the  
    176. STEAG trainees perform well  
    13 trainees fast-track their apprenticeships and qualify with “B” and “A” grades Herne/Essen. On account of their good performance during their apprenticeships, 13 technical trainees at STEAG were given the opportunity to shorten their courses by six months. All the trainees took up the opportunity  
    177. Development of components  
    Conical displacement outlet VA-K Low-turbulence displacement flow for halls where supply air must be discharged from a great height. Displacement ventilation for indoor firing ranges VA-RSA The system is designed to ensure an extensive supply air distribution into indoor firing  
    178. STEAG Energy Services wins nuclear decommissioning contract in Switzerland  
    STEAG Energy Services, the services subsidiary of STEAG, and Kraftanlagen Heidelberg will be working together to dismantle the core internals of the reactor pressure vessel at the Mühleberg nuclear power plant. Essen. In cooperation with Kraftanlagen Heidelberg, STEAG Energy Services GmbH (SES)  
    179. STEAG provides climate-friendly geothermal energy in Erding  
    Investment of 7.8 million euros will save 13,000 tonnes of CO2 per year in future STEAG New Energies GmbH and the Zweckverband Geowärme Erding are expanding the existing Erding 1 combined heat and power plant, which will enable up to 18 per cent of the total heating requirements of the Bavarian  
    180. STEAG solar power continues to grow under the Spanish sun  
    SENS constructs a further 180 MWp in Andalusia Würzburg/Almeria. In the sunny country of Spain photovoltaics is to be given a massive boost - this was the goal set at the end of 2018 by the Spanish government, which then created the legal framework for its implementation. Würzburg’s STEAG Solar  
    Search results 161 until 180 of 308